Thesis Committee

Meeting Nº4

29 March 2021


Updates and progress on work

An updated rundown of the truly endless list of to-dos.

Revised timeline


01

Progress Update

An updated rendering of what the install could potentially look like in the current project space at Glass. Some of the furniture items have since been acquired and rendered this schema slightly outdated but everything can still be installed, de-installed, and re-installed fairly easily. The "entrance" is now a curtain of some kind, the magazine rack is something that will now be hung on the wall, and there will now be a combo sidetable/lamp instead of two side-tables, for example.


The pamphlets have also been laid out. There will be a slight design adjustments for the covers, and possibly a couple more additions to this Vol. 1. These pamphlets fluff up the narrative with a sort of 'genesis' to how the Void came about. They can be read below.


RAM Vol. 1 Nº1 — TYDEWMYCBDFSR →

RAM Vol. 1 Nº2 — 53V3R

RAM Vol. 1 Nº3 — PISMO →

RAM Vol. 1 Nº4 — DAY AFTER DAY →

RAM Vol. 1 Nº5 — TWO YEARS AGO →



02

Outstanding Items

A non-exhaustive list of moving parts and pieces


SPACE — STAINED GLASS

→ Ceiling lampshade 1

→ Design ✓

→ Cut + solder

→ Ceiling lampshade 2 – Tentative

→ Design ✓

→ Cut + solder

→ Ceiling lampshade 3 – Tentative

→ Design ✓

→ Cut + solder

→ Side table lamp

→ Design ✓

→ Cut + solder

→ Café window(s)

→ Design ✓

→ Cut + solder

SPACE — CERAMICS

→ Cups for display/sale

→ Plates for display/sale

→ Side table lamp base ✓

→ Checkerboard coasters for display/sale

→ Boobies vases for display/sale

→ Asst. of tchotchkes for shelves/table/display/sale

→ Coffee beans – Tentative

SPACE — FURNITURE

→ Loveseat ✓

→ Source

→ Order fabric ✓

→ Reupholster ✓

→ Magazine rack ✓

→ Shelving

→ Finish

→ Table + seat

→ Build ✓

→ Refinish

→ Source new rugs (area rugs, red, x2) ✓

→ Source more mirrors ✓

→ Source side tables

SPACE — PRINTED MATTER

→ Pamphlet series (unsent letter-style) ✓

→ Writing ✓

→ Printing

→ Welcome "menu" - Tentative

→ Coffee beans stickers for packaging – Tentative

THESIS — WRITING

→ 1st draft ✓

→ 2nd draft ✓

→ Final draft in progress

A/V

→ Informercial

→ Storyboarding ✓

→ Shooting

→ Editing

→ Voice-over narration – Tentative


03

Timeline

A very loose timeline to get us to the finish line.


MARCH

FURNITURE

x Source loveseat

x Order upholstery fabric

x Source side table (x1)

• Refinish tables + side tables

x Source or rehab magazine rack

• Refinish shelving + install

/ Source mirrors (x10-12)

x Do something about the rug sitch

x FIGURE OUT WALL SITCH

STAINED GLASS

• Design + cut lampshades (x3)

• Design + cut table lamp

x Source hardware (light sockets + wiring)

THESIS

x Draft 2

A/V

x Start storyboarding infomercial

APRIL

STAINED GLASS

• Café window design + cut

CERAMICS

• Cups (x6)

• Plates (x6)

• Table lamp base (x1-2)

• Boobie vases (x6-10)

• Tchotchkes based on Lotería cards

• Checkerboard coasters (x4)

• Coffee beans

PRINTED MATTER

x Design + print pamphlet series

• Design welcome menu

• Design coffee bean bag sticker

THESIS

• Draft 3 / finalise

A/V

• Shoot at Glass space

MAY

INSTALL

THESIS

• Final + print

A/V

• Shoot at exhibition space

• Edit infomercial

• Voice over ?